I-84, Franklin Road Interchange to Karcher Road Interchange (East and West) | Canyon County, ID
Horrocks provided comprehensive CE&I services for two fast-paced, Federal-aid interstate reconstruction projects along I-84 between the Franklin Road and Karcher Road interchanges. Together, these projects represented a major investment in regional mobility, safety, and infrastructure capacity between Caldwell and Nampa.
_edited.png)
Project Overview
Horrocks provided comprehensive CE&I services for two fast-paced, Federal-aid interstate reconstruction projects along I-84 between the Franklin Road and Karcher Road interchanges. Together, these projects represented a major investment in regional mobility, safety, and infrastructure capacity between Caldwell and Nampa. The work included approximately 5 miles of interstate widening and reconstruction, adding a lane in each direction to create 6 lanes of rigid pavement, along with extensive interchange, bridge, and corridor improvements.
Services Provided
Performed construction inspection and materials testing
Administered contracts and maintained document control
Coordinated preconstruction meetings and ongoing contractor communications
Tracked quantities and verified pay items
Conducted quality assurance and compliance monitoring
Supported project closeout activities
Challenges
The projects were delivered under fast-paced construction schedules while maintaining interstate and local traffic through a highly constrained urban corridor. Maintaining safety and mobility for the traveling public during major interstate reconstruction required careful coordination, constant inspection of presence, and responsive problem-solving.
Project complexity was further increased by the number of structures and interfaces, including interchange improvements at both Franklin Road and Karcher Road; construction of overpass and underpass bridges, canal crossings, median barrier walls and sound walls; and ramp modifications. Horrocks addressed these challenges through proactive CE&I leadership, real-time coordination with contractors and ITD, and rigorous quality control and documentation processes.
Successes
Successfully delivered full CE&I services on two high-profile, fast-paced, Federal-aid interstate projects
Supported widening and reconstruction of 5 miles of I-84, increasing capacity to six rigid pavement lanes
Ensured construction quality and long-term performance through comprehensive inspection and materials testing
Improved coordination and issue resolution by integrating design support with construction phase services
Maintained compliance with ITD and Federal standards while ensuring safety, quality, and efficiency
Through proactive management, technical expertise, and hands-on construction oversight, Horrocks supported the successful delivery of critical interstate improvements that enhanced safety, increased capacity, and supported long-term regional growth. Horrocks’ CE&I leadership helped strengthen one of Idaho’s most vital transportation corridors.